IBM has broken a mathematical record in an eco-friendly way by validating nine terabytes of data in 20 minutes using just 1% of the electrical energy that would normally be required.
Related posts:
- IBM eX5 server slashes SQL Server licence costs
- Auction Closing – Multi-Tech Systems MT9234ZBA-NAM-WORLD MODEM V92 DATA F – USA – $155.18http://www.sh-ur.info/ch/58299
- Smartphone Wi-Fi has promise, drawbacks for mobile data traffic offload
- Verizon-Skype mobile VoIP app tests profitability for voice as data
- Through Value Engineering, Storm Copper Keeps Costs in Check (source: PR Leap)
- Tin, Silver, Nickel and Lead Plating – Cost-Saving Advantages From Storm Copper Components (source: PR Leap)
- Skype shows BlackBerry, iPhone applications (source: InfoWorld)
- Bezeq Group Reports Full-Year 2009 Financial Results [1] (source: prnewswire.com)
- Enhancements made through digital technology (source: Biz Journal)
- Keeping cellular phone costs in check: Try using a pooling plan (source: Biz Journal)